Total cost: $30,000-$150,000 for a finished 1-container ADU (everything in, depending on finish level). Container itself: $4,500-$9,500. Build time: 4-12 months. Code-compliant builds need permits, licensed trades, and proper insulation. Most successful container homes start with a One-Trip container.
Buy One-Trip for visible builds. 40ft High-Cube is the most common size (9'6" interior gives finish room). Standard height works for tighter ceilings.
Permit-compliant foundation: piers at the corner castings, or a full slab. Stick-built homes don't use container foundations — your inspector needs to see real engineering.
Windows, doors, patio sliders. Any opening over 36" wide needs a welded steel header. Hire a container modifier — DIY plus an experienced welder works too.
Closed-cell foam on walls + ceiling is the standard. Stops condensation and gives R-13 to R-30 depending on climate. Then framing for drywall on top.
Licensed trades. Code-compliant rough-in then drywall. Container homes are wired like any other small dwelling — nothing exotic.
Drywall, paint, flooring, fixtures. Certificate of Occupancy comes after final inspection. From here it lives like any small home.
We sell containers, we don't build conversions — but the right starting container makes every step downstream easier. Here's what to pick.
Tell us your project — size, finish level, climate. We'll match the container shell that makes your conversion easier. We don't build the conversion; we make sure you start with the right shell.