Tilt-bed delivery to all 58 CA counties from our Middletown, NY depot. Used and new containers in stock. Typical lead time to California: 10–14 business days.
California is far from Middletown, but we ship there regularly through regional partner depots. Lead time is typically 10–14 business days. Worth the wait for crane-truck placement.
Pick your container on the site or call directly. $0 due today. We confirm everything by phone before any payment.
Our placement expert reviews your address, access conditions, and CA-specific considerations (zoning, HOA, terrain) and locks the exact price.
The tilt-bed truck arrives with a 2-hour window, driver walks the path, places the container where the truck can reach it. Not at the curb.
Three use cases we see all the time in CA. If your situation isn't here, call us — we've probably done it before.
Vineyard and ag operation storage in the Central Valley.
ADU and tiny-home builds.
Restaurant pop-ups and event vendors.
California spans every climate zone — Mediterranean coast, Central Valley heat, Sierra mountains, desert. Containers fit all of it. Permit + zoning rules vary dramatically by county; some cities allow containers as ADUs, others prohibit them outright. Earthquake retrofits matter for permanent placements.
Central Valley + wine country operations using insulated + refrigerated containers.
California ADU market is huge — containers are a common starting shell for converted dwellings.
Studio + production operations using containers for on-set storage + equipment.
Bay Area + Silicon Valley operations using containers for equipment overflow.
The most-requested size in the lineup. 40ft footprint + 9'6" exterior height = the most cubic…
Double the length of a 20ft for less than double the price. Best cubic-feet-per-dollar value in…
Pre-insulated walls, ceiling, and floor. Holds temperature in non-refrigerated applications — wine, food storage, comfort-grade office…
Some California cities (Oakland, Berkeley, San Francisco) have explicit container-ADU rules. Many others allow them with standard ADU permits. Local jurisdictions vary widely — call the city building department before planning.
Containers are over-engineered for vertical loads. For seismic zones, anchor at corner castings to a poured-concrete pad or foundation. Most California ADU permits require seismic-rated foundations.
Outside our direct delivery zone — partner network handles California placements. Lead times 10-14 days. Multiple container orders ship more efficiently.
Containers survive most wildfire exposure — steel doesn't burn. Defensible space around the unit matters more than the container itself.
Reserve online or call directly. $0 due today — payment is taken only after a placement expert confirms CA site access and locks the final price.
Browse inventory →(845) 343-0700
Mon–Sat · 7am–7pm ET · Real humans, no call center
California packs every climate into one state — Mediterranean coast, Central Valley heat, Sierra cold, and desert — and a steel container handles all of it. We reach California through our vetted partner-carrier network, typically 7 to 14 days, and multiple units ship efficiently on one trip. What changes most across the state is the permit office: some cities welcome containers as ADUs, others prohibit them outright, so here is how it breaks down market by market.
Why more California buyers buy instead of rent. Half of U.S. renters now spend at least a third of their income on housing — a record 22.6 million households (Harvard Joint Center for Housing Studies, 2025) — and self-storage already reaches 13.4% of U.S. households (Self Storage Association). Against that, a one-time container purchase adds secure space for less than building it or paying month after month. An increasingly common use, here as everywhere, is the backyard office or studio: with roughly 28% of paid workdays still remote (WFH Research), a 40ft high-cube becomes a finished room.
Los Angeles, Orange County, the Inland Empire, and San Diego drive demand through construction, film and production storage, and the booming ADU market, where a container is a common starting shell for a converted dwelling. Jobsite tool security on 40ft units is the everyday workhorse. Permitting varies sharply by city, so confirm before you order.
Tech and research operations use containers for equipment overflow, and several Bay Area cities have explicit container-ADU rules. Oakland, Berkeley, and San Francisco set their own paths here, so the city building department is the first call for any permanent placement.
Agriculture and viticulture from the San Joaquin to Napa and Sonoma rely on insulated and refrigerated units for produce, barrels, and supplies. Valley heat makes light paint and ventilation worth specifying up front.
Mountain and high-desert sites need secure, mobile storage that holds up in temperature swings. Rural placement is usually simple; for any permanent foundation in a seismic zone, plan the anchoring and confirm local requirements.
Delivery cost you cannot predict.
We confirm the exact, all-in delivery price by phone before you owe anything — no surprise fees on delivery day.
Buying a box you cannot inspect.
$0 is due today. Payment is taken only after a placement expert reviews your site and the container is set where you want it — not before.
Permits and zoning.
California is the widest range in the country — some cities (Oakland, Berkeley, San Francisco) have explicit container-ADU rules, many others allow them with standard ADU permits, and some prohibit them outright. Permanent placements in seismic zones need proper anchoring. Always call the city or county building department first; we flag what we see on the site walk.
Whether the truck can reach the spot.
Metro and hillside sites need a clear approach and a placement window; valley and rural sites are usually straightforward. We confirm access on the call, before any payment.